Some views of the three construction projects running concurrently--waste area and wastewater treatment area at the hospital; garage; three-bedroom house.
| Constructing a viewing point for a long run of pipe | 
| The WATSAN office and stock | 
| The kitchen area, with trenches open for the pipes to install faucets for the newly-constructed washing area. | 
| Evapotranspiration trench opened in preparation for receiving filtered water from the kitchen's grease trap. | 
| Connecting the showers to the plumbing system. | 
| The waste area, under construction. | 
| Our blocks of latrines and showers. | 
| Redoing the plumbing to route wastewater to grease traps. | 
| Protecting our borehole. | 
| Delivery of a container that will be the structure and shelter of our new garage. | 
| The roof structure for the new garage. | 
| Steel delivery for our roof structure. | 
| Ready for roofing! | 
| Laying out the design for the new house. | 
| Foundations dug--that was fast. | 